Osama Maabreh, Ph.D.

Aviation infrastructure

Istanbul Grand Airport

Project controls and BIM engineering on one of the largest airport programs ever built.

Role
Project Controls and BIM Engineer, Kalyon Holding
Location
Istanbul, Türkiye
Period
Sep 2017 – Dec 2018
AviationBIM4D schedulingMega-project

Istanbul Grand Airport was delivered at a scale and pace few programs ever attempt. I joined Kalyon Holding as a project controls and BIM engineer during construction.

I integrated Primavera P6 schedules with 3D models in BIM 360 to visualise sequencing and reduce schedule risk, and led 3D BIM coordination across multiple work scopes — resolving clashes against the baggage handling system (BHS) path in the federated model.

Critical-path analysis prioritised procurement on a compressed timeline, and I oversaw the substation, electrical switchgear and dedicated server-room cooling systems that support the BHS.

Highlights

  • 4D sequencing: Primavera P6 schedules linked to BIM 360 models
  • Clash resolution against the baggage handling system path in the federated model
  • Oversight of BHS substation, switchgear and server-room cooling systems